Pre-Installation Mandatory Requirement
1. Continuous supply of Distilled water or DM water with a tap for boiler input of ½” BSP at 3 feet height
2. Room temperature around machine preferably at 25°C with air conditioning or a well-ventilated room with an exhaust fan. The surrounding    temperature should not exceed 30°C
3. Stabilized input voltage of 230V AC, 20 Amps. Use of Servo Controlled Stability Chamber is recommended
4. Water drain line with ½” nozzle to be provided at floor level.
Safety Features
stability chamber
 

• High temperature safety cut-off
• Low water level boiler cut-off
• Electrical overload cutoff relay for compressor
• Time delay for compressor switch ON